24/06/2026
Before the walls go on, there’s a lot happening behind the scenes.
This pod is still in its build stage, with the roof and flooring already installed, giving you a rare look at what sits inside the structure. In each corner, we install 50mm downpipes that connect to the guttering system, directing water safely away from the pod.
It’s the details you don’t always see that help make a Pepperberry Pod built to last.