There has been so much happening on and off the job site recently. It’s been a huge 2 weeks since our Easter break. Firs...
24/04/2026

There has been so much happening on and off the job site recently. It’s been a huge 2 weeks since our Easter break.

Firstly congratulations to my apprentice Scotty, he is now in his second year after starting out as a school based apprentice.

We have almost completed a full bathroom renovation @ Brassall, kitchen reno @ Raceview, started our Yamanto renovation. This job involves a new floor as the old timber tongue and groove boards were squeaky, building a new ensuite, covering the brickwork, removing windows in stairwell and completing the downstairs toilet/laundry/stairwell area.

An update on the Laidley renovation will be coming soon. Front stairs and handrail have been complete, shelving in the robes complete, cabinetry in ensuite, laundry and kitchen has been installed, stone tops measured and installed, tiling is underway and floor covering prep has been completed.

Laidley renovation update. Plastering has been completed, great effort by the boys @ Exact Interior Linings. We have als...
03/03/2026

Laidley renovation update. Plastering has been completed, great effort by the boys @ Exact Interior Linings. We have also completed the soffit and bulkheads to fully enclose the house.

Huge week this week. 240m2 of driveway prepped and poured. Demo on a new bathroom,toilet,laundry, kitchen complete. And ...
21/02/2026

Huge week this week. 240m2 of driveway prepped and poured. Demo on a new bathroom,toilet,laundry, kitchen complete. And the internal sheeting complete on the Laidley reno.

It’s been a huge start to 2026 for the team and myself. We have completed a full bathroom toilet reno at Flinders view. ...
15/02/2026

It’s been a huge start to 2026 for the team and myself. We have completed a full bathroom toilet reno at Flinders view. At the Laidley extension we have completed the brickwork, cladding, remodeled the transition from existing house to extension, framed the ceiling inside and on the patio, roughed in the electrical and plumbing and now have about 75% of the sheeting complete inside.

The rest of Feb will continue to be full steam ahead with a huge driveway pour, another renovation start, complete the sheeting and plastering at Laidley.

Another quality retaining wall post install. Doesn’t get any straighter than dead straight.
20/08/2025

Another quality retaining wall post install. Doesn’t get any straighter than dead straight.

Had JMAC Bricklaying do the brick base for my build at Laidley this week. Great guy to work with and the quality of his ...
11/07/2025

Had JMAC Bricklaying do the brick base for my build at Laidley this week. Great guy to work with and the quality of his work is fantastic. He will be back once the frame is complete to finish the brickwork.

Deck refurb complete this week. Joists were rotted and handrails were aging. Laminated new joists beside all existing jo...
07/07/2025

Deck refurb complete this week. Joists were rotted and handrails were aging. Laminated new joists beside all existing joists which makes this deck so much firmer to walk on. Changed the whole look of the house with the modern stainless steel wire handrails. All decks under 1000mm which means no regulations on the handrails as none are required. Owner opted for 5 strands to keep the view nice and open.

Footings and posts installed this week at our Laidley job.
20/06/2025

Footings and posts installed this week at our Laidley job.

The renovation/extension @ Laidley has commenced. With site set out now complete the excavation of footings will commenc...
02/06/2025

The renovation/extension @ Laidley has commenced. With site set out now complete the excavation of footings will commence end of next week (other jobs and availability of machine being the delay). See if we can’t have this build complete for Christmas.

First job of 2025 complete. Opening cut into an internal brick wall. Finished with 140mm colonial architraves. Really op...
16/01/2025

First job of 2025 complete. Opening cut into an internal brick wall. Finished with 140mm colonial architraves. Really opens up the whole house with connecting the kitchen and dining room.

Address

Ipswich, QLD

Telephone

+61423764810

Website

Alerts

Be the first to know and let us send you an email when WDK Building & Renovations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to WDK Building & Renovations:

Share