Call Mike Flooring

Website Contact the business

Call Mike Flooring One Call to Install it All!
Call Mike and we will help you get the perfect flooring to refresh your existing house, or to fit out a new build! Call for a quote!

Specializing in:
Hybrid vinyl, Laminate, Engineered Timber Flooring, Floor Prep & Stairs.

25/11/2026

Installation day at Abbotsbury — 250m² of engineered timber going direct stick across a double storey new build. 🪵

After prep day — grinding high spots downstairs, priming and flood coating upstairs on Alphafloor — both floors were ready to go.

We started upstairs first. Direct stick means every plank is glued straight to the subfloor — no floating, no underlayment, just timber bonded directly to the prepared surface. It takes more time and more care, but the result speaks for itself. No bounce, no movement, solid underfoot from day one.

Then downstairs — same method, same standard, different floor level.

250 square metres done across two storeys, and the finished result is exactly what a new build should look like. đź’Ş

📞 0414 467 281

Send a message to learn more

23/11/2026

Prep day at Abbotsbury — 250m² of engineered timber going direct stick across a double storey new build. 🪵

Two different subfloor situations, and each one needed its own approach.

Downstairs the builder had already screeded, so our job was to grind the high spots back and prime the screed with two coats to seal it up properly before any adhesive goes near it.

Upstairs on Alphafloor, we filled the gaps between the sheets, then primed and poured a full flood coat of self-levelling compound to smooth everything out and give us a flat, consistent surface to lay over.

Lots of prep. Lots of mixing. All of it matters. When you're sticking engineered timber direct to the subfloor, there's no room for inconsistency. đź’Ş

📞 0414 467 281

Send a message to learn more

10/11/2026

Installation day at North Rocks — engineered timber going down across the full ground floor. 🪵

After prep day — grinding high spots and pouring self-levelling compound on all the low areas — the slab was ready. Today the floor goes in.

Entry, media room, dining, kitchen, under-stairs storage — glue-down engineered timber throughout. Every plank laid straight onto the prepared slab the way it should be done.

When the prep is right, the installation runs smoothly. That's the whole point of doing it properly the first time. đź’Ş

📞 0414 467 281

08/11/2026

Prep day at North Rocks — new home, bare slab, downstairs areas throughout. 🪵

Entry, media room, dining, kitchen, under-stairs storage — the full ground floor. Before any flooring goes down, the slab has to be right.

Prep day involved two stages:

First — concrete grinding on all the high spots. New slab or not, there are always areas that sit higher than the rest. We grind those back so the floor is consistent across the whole area before anything else happens.

Then — priming the subfloor and pouring self-levelling compound on the low spots. Lots of them on this job. We prime the slab first so the compound bonds properly, then pour and work it into every low area until everything is level.

That's what it takes before the first plank goes down. No shortcuts. đź’Ş

📞 0414 467 281

01/11/2026

Installation day and the finished result — Gilead NSW. 🪵

Brand new single-storey home, 190m² of bare slab. After grinding and levelling on prep day, it was time to lay the floor.

Lumiere 7mm Hybrid in South Grove Oak throughout. A clean, modern tone that suits the space perfectly — and one of the better choices you can make for a new build. Durable, easy to maintain, and it looks the part from day one.

The slab prep made all the difference. When the base is flat and clean, the hybrid planks go down exactly as they should — consistent, tight, and level across the whole area.

Happy builder, great result. đź’Ş

📞 0414 467 281

29/10/2026

New build prep day at Gilead — 190m² of bare slab, ready to work. 🪵

Brand new single-storey house, and before the first plank goes down the slab needs to be right. Even in new builds, concrete slabs are rarely perfectly flat. Low spots, high spots, and variations across a large area — all of that shows up in the finished floor if it's not dealt with first.

Day 1 involved two steps:

First — concrete grinding across the full slab. This opens up the surface, removes any laitance or contamination, and reveals exactly what we're working with. Nothing goes down over an untreated slab.

Then — self-levelling compound on the low areas. We don't flood the whole slab if it's not needed. We identify where the slab is low, prime those areas, and pour compound to bring everything up to a consistent level. The rest gets spot-checked and prepped.

Once that's set, we're ready for installation. Lumiere 7mm Hybrid — South Grove Oak. Coming next.

📞 0414 467 281

11/10/2026

Installation day at Thirlmere — and the floor is going down. 🪵

After prep day — pouring self-levelling compound to bring the slab rooms up to tile height, and grinding the existing tiles ready for adhesion — everything was set. Today we're laying the engineered timber throughout the house and granny flat.

Glue-down installation across all the areas that were previously carpet. The existing tiles in the hallways, kitchen and dining stay in place — the new engineered planks tie the whole floor together seamlessly at the same level.

This is what all that prep work was for. When the subfloor is done properly, the installation goes smoothly. đź’Ş

📞 0414 467 281

08/10/2026

Installation day at Thirlmere — and the floor is going down. 🪵

After prep day — pouring self-levelling compound to bring the slab rooms up to tile height, and grinding the existing tiles ready for adhesion — everything was set. Today we're laying the engineered timber throughout the house and granny flat.

Glue-down installation across all the areas that were previously carpet. The existing tiles in the hallways, kitchen and dining stay in place — the new engineered planks tie the whole floor together seamlessly at the same level.

This is what all that prep work was for. When the subfloor is done properly, the installation goes smoothly. đź’Ş

📞 0414 467 281

05/10/2026

Prep day at Thirlmere — and there's a lot to do before the first plank goes down. 🪵

This is a full renovation of an existing house and granny flat. The owner had already pulled up all the carpet, leaving bare slab throughout the rooms. The hallways, kitchen and dining areas are existing tiles that are staying — so everything needs to level up to meet them.

Day 1 involved two key steps:

First — priming and pouring self-levelling compound in all the rooms that were previously carpet. The slab sits lower than the tile height, so we need to bring it up to match before we can lay the engineered timber across the whole area seamlessly.

Second — grinding and abrading the tile surfaces. The new engineered planks will be glued straight over the existing tiles, so the surface has to be properly prepared to get a solid bond. No shortcuts here.

Ready to start laying tomorrow. Stay tuned. đź’Ş

📞 0414 467 281

Address

Sydney, NSW

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm
Saturday 9am - 6pm

Alerts

Be the first to know and let us send you an email when Call Mike Flooring posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Call Mike Flooring:

Shortcuts

Sponsored

Share