10/04/2024
Tore down the back wall to reframe it with with a patio door and window opening. For now we’ve insulated over everything and will cut the openings out when the door and window arrive. Interior plumbing rough in is complete, floor joists laid, foundation wall concrete blocks patched in at the front garage door and existing door opening. Interior framing is complete and electrical roughins started today!