Shey and Sons Building Construction

Shey and Sons Building Construction A Building Construction Advisor and a Biofil Toilet Technician.

🔩 Field workers know this—what is it?
23/04/2026

🔩 Field workers know this—what is it?

My advice is this: before you think of starting a project, do yourself a favor by getting a complete drawing of that pro...
04/04/2026

My advice is this: before you think of starting a project, do yourself a favor by getting a complete drawing of that project before you start. A lot of people make this mistake; they will just tell you, 'Engineer, I don't have money for a plan, please do anything on that land all I need is a place to stay but it's not so.
I am not a big man. Big men no dey pay drawings because drawings have a lot of things to guide you and protect you from future damage.

Your satisfaction is our priority
☎️+237682079666

This image demonstrates the water level hose technique used in construction to transfer level points between distant loc...
27/02/2026

This image demonstrates the water level hose technique used in construction to transfer level points between distant locations.

27/02/2026

A Building Construction Advisor and a Biofil Toilet Technician.

Contact us for more information on your Biofil Digester Toilet. We can also convert your old septic tank system to a Bio...
04/12/2025

Contact us for more information on your Biofil Digester Toilet. We can also convert your old septic tank system to a Biofil Digester Toilet, allowing you to enjoy its numerous benefits.

At the site
29/10/2025

At the site

14/10/2025

When you dnt use vi****or while casting Ur concrete whether manual or automatic,and when your concrete mixture is hard,this is what you get ...

Balcony preparation
12/10/2025

Balcony preparation

Foundation and base frame installation of a light-frame building
12/10/2025

Foundation and base frame installation of a light-frame building

Please avoid putting Ur plumbing pipe inside columns and beams. It is a significant error in the building process. Colum...
12/10/2025

Please avoid putting Ur plumbing pipe inside columns and beams. It is a significant error in the building process. Columns and beams are designed to carry a load. The presence of pipe inside columns and beams will take up the space that concrete is supposed to occupy, thereby causing a structural defect in the building, since the column is not well reinforced. Take note of that....

Why You Should Never Put Pipes Inside Rebar (Column Reinforcement):This image highlights a major construction error, whe...
07/10/2025

Why You Should Never Put Pipes Inside Rebar (Column Reinforcement):

This image highlights a major construction error, where PVC pipes are installed inside the vertical column reinforcement (rebar). This practice is structurally dangerous and should be completely avoided. Here's why:

1. Weakened Structural Integrity

Columns are designed to carry loads from the building down to the foundation.

Pipes inside rebar cages displthereby ace concrete,column's reducing the load-car of the column.

This can lead to cracking, buckling, or even collapse under stress.

2. Interrupted Concrete Flow

During casting, concrete is expected to flow and bond around the rebar to form a solid, monolithic structure.

When pipes block that flow, it leads to honeycombs and voids around the rebar, which reduces strength.

3. Corrosion Risk to Rebar

Pipes may develop leaks over time.

Moisture trapped near the steel can cause rusting, which expands and cracks the concrete.

4. Difficult Maintenance

If the pipe gets damaged or blocked, access is nearly impossible without breaking the column, which could compromise the whole building.

5. Violation of Building Codes

Standard engineering practices and building codes strictly prohibit embedding non-structural elements (like pipes) inside primary load-bearing elements.

Correct Alternative:
Run pipes outside the column and encase them in walls or chases.

If passing vertically, create a separate duct or service shaft that won’t interfere with structural elements.

Takeaway for Builders & Homeowners:

If your mason or plumber suggests passing pipes through columns, STOP IMMEDIATELY. It’s a red flag that they lack structural knowledge.

Always consult a qualified structural engineer before making decisions that affect your building’s skeleton.