20/08/2026
Pictures before and after replaced shower tray inlc. adjusting waste, and enclosure and framed up and fitted shower wall panels incl. adjusting pipework to suit different type of shower also sealed kitchen worktop by sink and patched in part of wall where plaster had peeled and replaced architrave to both sides of doorframe nearest shower due to the previous leak. Started Monday and finished today.