02/05/2024
This one was quite a challenge.
3 layers of flooring up and pipework renewed. Original floor relayed and patched with 2 new layers over it.
Ceiling dropped and levelled and new lighting and extraction fitted.
Larger shower tray fitted with the walls brought in to create a fully waterproof area with option left for a door if needed/wanted.
Lavanto marble wall boarding around whole room (over 30 boards)
Brushed brass fittings and coniston blue furniture.
Freestanding double ended bath to allow a soak with a view out of the window.
Towel rail added in between the windows and radiator changed for a center rad t/rail again all in brushed brass.