24/06/2026
A before and after of this lead dormer, with the original lead holding on for dear life. Amazed it was left like this and stayed put.
All code 5 lead used and a code 6 flat roof. Using copper straps under the welts so this isn’t going anywhere any time soon, now moving on to tile replacements. 🙂