08/10/2025
Underpinned, renovated, extended and fitted with high spec renewable energy apparatus (in place of the oil fired system, to provide space and water heating for both the outbuilding and the main Listed dwelling).
A year in the design and planning of this Grade II Curtilage Listed building and 28 weeks to build. A special thank you to Martin and Maggie for instructing us to take on this challenge.