14/10/2021
Mr S moved into his new build on Elba Park but decided the tiling to the main bathroom was not adequate.
After a site visit we advised on where to go to view tiles, after he chose a range of Wall & Floor tiles he liked, we arranged a fitting date to suit.
The WC, basin and towel warmer were all removed as were the tiles ready to prepare the walls to receive the new Wall tiles.
Prior to the new tiles a thermostatic dual mixer shower for over the bath was installed.
The floor was prepared and tiled in the co-ordinating tile to the walls.
All fitments replaced and a tri - fold bath screen was added to finish everything off.