13/11/2026
Playground repairs completed at The Vale Primary School! 📍
Several areas of the playground have been resurfaced, creating a bright, clean and refreshed space for the children to enjoy.
The works included:
• Removal and disposal of the existing surfaces.
• Installation of an 80mm SBR 2–7 rubber crumb base.
• Installation of a 15mm EPDM 1–3 wearing course.
• Trowelled finish to achieve smooth, seamless and vibrant surfaces.
Another fantastic transformation, providing a fresh new look and a space for the children to enjoy!