Crown Building

Crown Building Covering all aspects of building we are a company with over 15 years in the trade. All workers are f

Nearly there on an on going extension project...Scaffold up another lift ready for structure to be completed to wall pla...
02/10/2018

Nearly there on an on going extension project...
Scaffold up another lift ready for structure to be completed to wall plate.
More pictures to follow...

All types of stone work undertaken....Here are two previous jobs, The first is tumbled, course stone finished with a rec...
28/09/2018

All types of stone work undertaken....
Here are two previous jobs, The first is tumbled, course stone finished with a recessed joint and the second is random stone finished with a flush joint.
Jobs also included stone sills, mullions and heads.

Planter, bushes and soil removed.New footing installed. New planter reduced in size, built using recycled bricks and cop...
21/09/2018

Planter, bushes and soil removed.
New footing installed.
New planter reduced in size, built using recycled bricks and copings.

On going extension project.Scaffold up and ground floor structure completed, with first floor to go on this week. More p...
20/09/2018

On going extension project.
Scaffold up and ground floor structure completed, with first floor to go on this week.
More pictures to follow...

Wall rebuilt using recycled bricks after been knocked down by a car.Wall also reduced in length and patched with tarmac....
18/09/2018

Wall rebuilt using recycled bricks after been knocked down by a car.
Wall also reduced in length and patched with tarmac.
No job too big, no job too small.

On going extension project.Scaffold going up Monday then structure to be completed to first floor and floor going on nex...
14/09/2018

On going extension project.
Scaffold going up Monday then structure to be completed to first floor and floor going on next week.
More pictures to follow...

Footing completed today for a double storey extension, ready for concreting this week.Structure to commence build next w...
05/09/2018

Footing completed today for a double storey extension, ready for concreting this week.
Structure to commence build next week with more pictures to follow.

Single storey extension.Brickwork and Blockwork completed today. All brickwork and pointing done to match existing house...
04/09/2018

Single storey extension.
Brickwork and Blockwork completed today.
All brickwork and pointing done to match existing house.

Concrete block shed, with double steel door opening.External pillars on back and sides for extra space.Finished with con...
30/08/2018

Concrete block shed, with double steel door opening.
External pillars on back and sides for extra space.
Finished with concave pointing internal and external.

Address

Leeds
WF76LS

Alerts

Be the first to know and let us send you an email when Crown Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share