07/06/2026
Wee had the pleasure of working on the roof for the new rooms for
This consisted off.
- full strip off , slates, lead and 3 layers of of torch on felt 🥵
- Wood repairs along with capping copes with ply wood
- vapour barrier and 100mm insulation too flat roof then alwitra single ply membrane
- Code 5 lead cap over copes stones
- Cupa H3 Spanish slates
- Finished with some zinc ridge
The before and after make it all worth it, for a slick watertight long lasting roof 😎