Hramov Build

Hramov Build Multi trade building refurbishment internal property

Wetroom
09/04/2025

Wetroom

Another one Change all over Finish with shower wall panels Aqua board.
02/02/2024

Another one
Change all over
Finish with shower wall panels
Aqua board.

That's before and after the job is done. Reap out wall tiles in the bathroom change all-new suit and fit new shower wall...
02/02/2024

That's before and after the job is done. Reap out wall tiles in the bathroom change all-new suit and fit new shower walls.

That’s before and after.Strip bathroom and install full new shower wall panel and complete bathroom.
18/10/2023

That’s before and after.
Strip bathroom and install full new shower wall panel and complete bathroom.

Rip out the kitchen and all tiles walls and floor, and prepare for new self-levelling, for new laminate flooring and ski...
02/10/2023

Rip out the kitchen and all tiles walls and floor, and prepare for new self-levelling, for new laminate flooring and skirting.
Now ready for new kitchen to be installed.

Before and after 2 weeks
22/09/2023

Before and after 2 weeks

Before / After wet room.
22/09/2023

Before / After wet room.

New full  fitted bathroom
21/05/2023

New full fitted bathroom

New bathroom installationn.
21/05/2023

New bathroom installationn.

Before and after Wetroom.
21/05/2023

Before and after Wetroom.

Address

Lincoln
Lincoln

Alerts

Be the first to know and let us send you an email when Hramov Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share