Just completed for Katherine and Chris. A long empty room in an already built extension wasn't being used. The customer wanted to make use of it with a cloakroom. A lot of work that remains unseen went into this job, getting hot and cold water to the cloakroom and waste and drainage products away, insulation and underfloor heating, floor levelling, new electrics and extraction. Once all this was done, the room was created. Plastered exterior with floor to ceiling ceramic tiles internally. BTW toilet with concealed cistern and 600mm drawer vanity, ceramic basin and chrome mono mixer. LVT flooring fitted to the cloakroom and the remaining floor area. New 7" Torus skirting boards and 3" matching architraves and an Oak veneer door completed the room. Other jobs were done at the property also.... new central heating thermostat, shelves fitted in the kitchen and bathroom, full central heating flush.