15/04/2026
🔧 As Promised… Here’s the Progress
Following ongoing issues with this system, we’ve now begun repiping to put things right properly.
The existing layout lacked structure and efficiency, which is why the system has struggled to perform since installation.
We’ve started reworking the pipework to create a much cleaner, more logical setup — improving flow, accessibility, and long-term reliability.
✔️ Pipework being reconfigured
✔️ System layout being corrected
✔️ Built with serviceability in mind
This is the difference a properly designed and installed system makes.
More updates to follow as we continue the transformation. 👀