HM Services

HM Services Providing high quality projects for people who love their home.

Another project completed with Through the RoofEn-suite bathroom created in new loft space. The room was boarded out and...
26/06/2026

Another project completed with Through the Roof

En-suite bathroom created in new loft space. The room was boarded out and waterproof boards used in shower area.

The floor was primed and overboarded with tile backerboard. Chevron wood plank effect tiles were fixed for a modern twist and then the walls were tiled in a rose pink glazed square tile.

Walls and floors were then grouted in complimentary colours and joints siliconed to colour match.

Latest project completed today.LVT isn’t just about wood effect planks.This tiled floor was failing due to poor installa...
02/05/2026

Latest project completed today.

LVT isn’t just about wood effect planks.

This tiled floor was failing due to poor installation. Grout was popping, tiles were cracked and moving when walking on them.

Porcelain tiles were removed and bagged. Substrate was prepped with 9mm ply, screwed at 100mm centres and then the edges feather screeded.

‘Cool Concrete’ LVT tiles were fitted from the Expona Stone range, with pressure sensitive adhesive, to compliment the kitchen worktops.

Another project recently completed. The customer had the room decorated and then I was tasked with fitting the floor. Fl...
30/01/2026

Another project recently completed.

The customer had the room decorated and then I was tasked with fitting the floor.

Flooring used for this project was the QuickStep Capture range of laminate. Quickstep underlay was first installed and then the flooring fitted on top with an expansion joint to allow for movement on a floating floor. A Scotia beading is then fitted sound the perimeter of the room to give the job a perfect finish.

Last job but one before Christmas.Firstly, thanks to Leeds waste movers for the removal and disposal of the outdated sli...
29/01/2026

Last job but one before Christmas.

Firstly, thanks to Leeds waste movers for the removal and disposal of the outdated sliding robes.

Then it was on to battening out the back wall to make it plumb and bring the new wardrobes forward by 40mm.

New wardrobes were constructed and fixed and then framed with new 4 panel shaker doors hung. Antique brass handles with knurled finish to complete the project.

Wardrobes were supplied by DFK, to customers specifications.

It’s all about the prep!!!!A recently completed project for a lovely customer. I’ve done quite a few tiling jobs for thi...
29/01/2026

It’s all about the prep!!!!

A recently completed project for a lovely customer. I’ve done quite a few tiling jobs for this customer, but they wanted something with a bit more ‘warmth’ for the lounge.

First, the existing screed was swept and hoovered in preparation for priming. Priming seals the substrate to stop the moisture being sucked out of the levelling compound and cure in the proper manner. It also helps the levelling compound flow better. It’s imperative that you have a perfectly flat and smooth surface as any imperfections may be seen once the floor covering is fitted.

The setting out of the planks on this job was to centralise so that the cuts were symmetrically balanced.

The planks used on this project were Urban 55 Regal Oak Herringbone.

I haven’t had a Wagon Wheel for years so the customer surprised me with one and a hot cuppa!!!

Address

Rothwell
Rothwell

Telephone

+447810206755

Website

Alerts

Be the first to know and let us send you an email when HM Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share