Out with the old in with the new FACC barrier replaced due to ongoing faults and a new BFT ultra 68 with a 7 metre boom installed.
The old barrier was removed and an even older barrier behind the actual barrier which was used to hold control equipment for the CCTV and intercoms was also removed.
The control equipment was relocated into its own IP rated metal box with a locked key mechanism.
All equipment was tested as part of the process and the site was left neat and tidy.
The client was really impressed with the new professional look.