• 3 • SHELDON • SQUARE •Joining the project late on, brought in by 8build, we had just 3 months from project award to co...
29/02/2024

• 3 • SHELDON • SQUARE •

Joining the project late on, brought in by 8build, we had just 3 months from project award to completion. Our dynamic approach and installation know how along with timely material supply and precise installation, ensured the success of this project. Worth it!

Project scope:
• 660m2 of aluminium decking, complete with drainage channels and gutters over 9 floors.
• 49 custom-designed planters, crafted from stainless steel with integrated lighting and irrigation systems. Powder coated to match the balconies.
• Tailored stepped access on level 8.
• 66 custom stainless steel lift threshold plates.

• WHITSTABLE • HOUSE • Going Above & Beyond!Design, supply and installation of 78m, 1800mm high glass balustrade. Applic...
21/02/2024

• WHITSTABLE • HOUSE •

Going Above & Beyond!

Design, supply and installation of 78m, 1800mm high glass balustrade. Application to the roof and inset balconies using square profile, jet black posts.

• Additional Works •

• Secondary steelwork for internal patient hoist system and folding partition door.
• Riser gratings for enhanced safety and functionality.
• Brick support brackets for structural integrity.
• CAT ladder installation for convenient roof access.
• Aluminium flashings blending the overall design for a cohesive look.
• External staircase for garden access.
• Raised paving to roof and balcony areas.
• Greenwall aluminium gutters ensuring efficient drainage.
• Aluminium window sills marrying aesthetics with functionality.

• HANDCROFT • ROAD •Progression 💪🏼6/9 stack balconies are in!This project sees a combination of single, double and tripl...
13/02/2024

• HANDCROFT • ROAD •

Progression 💪🏼

6/9 stack balconies are in!

This project sees a combination of single, double and triple stack configurations across two blocks.

A galvanised finish was specified and supplied, accompanied by a recessed decking design achieving a flush floor finish.

• SHELDON • SQUARE •The 12-story building’s comprehensive renovation prioritises sustainability as its core focus. This ...
08/12/2023

• SHELDON • SQUARE •

The 12-story building’s comprehensive renovation prioritises sustainability as its core focus. This project marks the first major refurbishment undertaken by British Land following the initiation of their 2030 strategy.

ISW secured the tender in September from new client, 8build. Progress is currently in full-swing on the nine terrace areas, where aluminum decking and custom planters is being installed. The anticipated completion of the project is set for early 2024.

• RIVERSIDE • PARK •The final phase of this development saw works carried out by ISW on 6 houses. The noticeable differe...
16/11/2023

• RIVERSIDE • PARK •

The final phase of this development saw works carried out by ISW on 6 houses. The noticeable difference between this space, at that of the appartments, is the preference of materials. The houses leverage the benefits of using glass more extensively.

Completed elements:

•        glass, button-clamp, Juliette balconies
•        inset-balcony, glass balustrade
•        rear terrace, glass balustrade
•        aluminium facias
•        internal, steel stair balustrade
•        glass balustrade to walkways
•        timber privacy screens
•        external stair, glass balustrades and handrail
•        steel frame and timber louvre gated stores

• RIVERSIDE • PARK •The third and final phase of the development is complete. ISW obtained the architectural metal packa...
15/11/2023

• RIVERSIDE • PARK •

The third and final phase of the development is complete. ISW obtained the architectural metal package for this project a little over two years ago. Back then, it stood as the most substantial package we had taken on, making the current successful completion particularly rewarding.

Displayed here are the completed elements on the apartment buildings:

• key clamp on the roof
• man-safe cabling
• glass balustrade to roof terraces
• balcony partitions and privacy screens
• AOV gratings
• bespoke roof access stair
• aluminium Juliettes
• external stair balustrades
• aluminium walkway balustrade
• internal handrails
• timber louvre panels to the car park
• steel frame with timber louvre bin and bike stores
• Fabrication and installation of a fully bespoke link bridge

21/09/2023

• THROW • BACK • THURSDAY •

Our first mention of the Riverside Park Development dates back to July 2021, and we're thrilled to announce that we've entered the final snagging stages.

This footage, captured in August 2022 at the halfway mark, offers a compelling glimpse into the detail involved in a project of this magnitude.

Completed project imagery coming very soon!

• GEORGE • WEST • HOUSE •Standing proud on Clapham Common, initially built in 1915, this architecturally stunning buildi...
14/09/2023

• GEORGE • WEST • HOUSE •

Standing proud on Clapham Common, initially built in 1915, this architecturally stunning building is now a residential space consisting of 63 units.

Interstellar was commissioned by SHS for the implementation of several key enhancements on this project. These included; the installation of an elegant frameless balustrade at the building's entrance, as well as the addition of external balustrades for the rooftop terrace apartments, complete with privacy screens. Furthermore, the stair landings were adorned with a sophisticated combination of glass balustrades and timber handrails, enhancing both safety and aesthetics.