19/06/2026
Work carried out on Industrial estate.
Grass cut and strimmed around kerbs.
All kerbs scraped with muck and w**ds removed.
All kerbs blown and cleaned.
Flower beds hand w**ded and strimmed around edges.
Along perimeter walls scraped and removed w**ds and muck.
Leaf fall, w**ds and muck removed from around all buildings and all blown.
Muck and sludge removed from carpark spaces.
Also general tidy up around footpaths and doorways.