25/04/2026
A Home in Port Erin continuing transformation in Port Erin ✨
Internal works this week included:
The majority of ceilings and partitions have now been clad with plasterboard.
The bathrooms will be ready for installation shortly
Ceiling vents have been installed throughout for a Mechanical Ventilation with Heat Recovery (MVHR) system.
All external window and door installations complete, with air tape applied to the frames and at the reveals/heads of openings.