09/07/2026
Another project is officially in progress! We've started the dismantling of the existing deteriorated roof framing and roof sheets in preparation for the installation of new steel framing system and re-roofing works.
This project is undertaken through our design and build by administration approach, ensuring close supervision, proper coordination, and quality workmanship throughout the entire construction process.
Stay tuned for more project updates as the work progresses. π§
Hereβs a list of the services we offer:
ππππππππ πππ ππ
πππππ ππππ ππππ πππ ππππ ππππππππ
β’ πΌππΎπππππΎππππΌπ πππΌπ - Prepared, signed, and sealed by a Registered Architect.
β’ πππππΎππππΌπ πππΌπ - Prepared, signed, and sealed by a Registered Civil Engineer.
β’ ππΌππππΌππ/πππππ½πππ πππΌπ - Prepared, signed, and sealed by a Registered Master Plumber.
β’ ππππΎππππΎπΌπ πππΌπ - Prepared, signed, and sealed by a Professional Electrical Engineer.
β’ πππΎππΌπππΎπΌπ πππΌπ - Prepared, signed, and sealed by a Professional Mechanical Engineer.
β’ ππππ πΏππππΎππππ & πΌππΌππ ππππππ πππΌπ - Prepared, signed, and sealed by a Professional Mechanical Engineer.
β’ ππππ ππππππΎππππ πππΌπ - Prepared, signed, and sealed by a Professional Mechanical Engineer.
πππππππππππ ππππππππππππ
β’ Structural Analysis
β’ Electrical Load Schedule & Analysis
β’ Fixtures Unit Analysis
β’ Hydraulic Calculation
β’ Pump Sizing
πππππ πππππππππ
β’ Technical Specifications
β’ Bill of Materials
β’ Cost Estimates
The total project cost may vary depending on the following:
βοΈ Material and Labor actual price as per date
βοΈ Approved awarded cost for contractor prior to construction
πππππ ππππππππ
β’ Design Consultancy
β’ Supply, Delivery, Installation, Testing & Commisioning of Air Conditioning Units
β’ Installation of CCTV
For your plans and designs, get an architect and their allied professionals. β
For inquiries, message us on our page, or you may contact us thru:
π0961-232-2387
π0995-133-0630
π© [email protected]
βοΈ