VABB Architects Group Inc.

VABB Architects Group Inc. A Cebu Based Architectural Design, Consultancy and Implementation Company

A peek of our latest Residential Project at Daan Bantayan,Cebu.
12/11/2023

A peek of our latest Residential Project at Daan Bantayan,Cebu.


"Schematic"BPO with a unique approach. This is our solution based on the clients needs and wants. Having a Playful and C...
21/09/2023

"Schematic"

BPO with a unique approach. This is our solution based on the clients needs and wants. Having a Playful and Cafe overall look. The design also considered the limited budget posted from the client.

PROPOSED 4- STOREY BLDG. (Schematic)GENERALLY, THE MAIN CONCEPT OF THE FAÇADE FOLLOWS SOME OF THE PRINCIPLES AND CHARACT...
12/08/2023

PROPOSED 4- STOREY BLDG. (Schematic)

GENERALLY, THE MAIN CONCEPT OF THE FAÇADE FOLLOWS SOME OF THE PRINCIPLES AND CHARACTER OF
MODERN ARCHITECTURE. FROM ITS PURE FORM TO EMPHASIS OF FINE AND CLEANER STRAIGHT LINES, TO THE
SIZE OF ITS FENESTRATIONS AND TOWARDS THE MATERIALS TO BE USED.

FORM
The building depicts a form at its purest, “the box”. These
boxes stacked, interlocked and differs in elevation to show the
eventual mass of the building. The main box comprises the
majority of the building areas and structure, the towering one
houses the elevator and fire exit stair while the third is in the
form of the canopy.

FENESTRATIONS (WINDOW OPENINGS)
The building window openings strictly adhere to the principle
of modern architecture. It has wide and tall glass windows at the
façade gives the building a modern and lighter look.



👉👉For inquiries, please message or call us. 👈👈

A Proposed Office (schematic)The concept was unique since the owner wants to avoid the conventional office set-up. The t...
05/08/2023

A Proposed Office (schematic)

The concept was unique since the owner wants to avoid the conventional office set-up. The team tends to treat the space in different ways. We consider an industrial ambiance with a café concepts. Making the space more playful.



For inquiries you can message or call us.

Roof Beam preparation
01/08/2023

Roof Beam preparation

Almost there... Architectural Works in ProgressCTTD: IDA
01/08/2023

Almost there...
Architectural Works in Progress
CTTD: IDA

2nd Floor Suspended Slab- Complete
03/07/2023

2nd Floor Suspended Slab- Complete

Commitment to the Public in collaboration with Davies Paints Philippines and UAP Metro Cebu "Blood Donation"
25/06/2023

Commitment to the Public in collaboration with Davies Paints Philippines and UAP Metro Cebu

"Blood Donation"

15/06/2023

Congratulations to all
❤️NEW ARCHITECTS❤️

Flawless Tile Work Installation..
09/06/2023

Flawless Tile Work Installation..

Address

#9 Orchid Street, West Capitol Site
Cebu City
6000

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 12pm

Telephone

+63323283445

Website

Alerts

Be the first to know and let us send you an email when VABB Architects Group Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to VABB Architects Group Inc.:

Share