(Protected Process for Architect, Client, and Contractor)1️⃣ Client Inquiry & Proposal– Discuss goals, budget, timeline–...
03/02/2026

(Protected Process for Architect, Client, and Contractor)

1️⃣ Client Inquiry & Proposal
– Discuss goals, budget, timeline
– No design work yet
✔ Protects architect from unpaid work

2️⃣ Architectural Design Contract (SPP 202)
– Define scope, deliverables, fees, revisions, IP
✔ Architect: scope & payment
✔ Client: clear expectations

3️⃣ Schematic / Concept Design
– Space planning, concept drawings
– Client approval to proceed
✔ Controls revisions early

4️⃣ Design Development
– Final layouts, materials, coordination
– Major decisions locked
✔ Prevents costly changes later

5️⃣ Contract Documents
– Permit-ready, signed & sealed plans
✔ Architect: legal authority
✔ Contractor: clear construction basis

6️⃣ Bidding / Contractor Selection
– Clarifications only, no construction risk
✔ Fair pricing & accountability

7️⃣ Construction Contract (Client–Contractor)
– Separate from design contract
✔ Roles and liabilities defined

8️⃣ Construction Phase Services (SPP 203)
– Periodic site visits, clarifications, evaluations
– No labor or safety control
✔ Architect avoids contractor liability

9️⃣ Variations / Change Orders
– Written approval before ex*****on
✔ No unpaid extra work

🔟 Completion & Turnover
– Punch list, turnover documents
✔ Clean project close-out

16/01/2026

Site visit

22/10/2025
01/10/2025

In season and out of season, God made them both. ☀️🌧️ Thank You, Lord, for every season of life. For the sunshine, the rain, and the lessons they bring.

📖 “He has made everything beautiful in its time.” – Ecclesiastes 3:11.

Site visit.

SATURDAY SITE. WORK OFFSET SCHEDULE
13/09/2025

SATURDAY SITE. WORK OFFSET SCHEDULE

Before building a 3-storey house with roof deck, a soil test (geotechnical investigation) must be done to check if the g...
02/09/2025

Before building a 3-storey house with roof deck, a soil test (geotechnical investigation) must be done to check if the ground can safely support the structure. Engineers drill boreholes, collect soil samples, and test them in a lab to know the soil’s strength, type, water level, and load-bearing capacity.

The results guide the foundation design ,whether standard footings are enough or if deeper/more reinforced foundations are needed. This prevents cracks, uneven settlement, or collapse, ensuring the building’s safety and structural integrity.




Address

OLD NO. 139 PUROK 4 BARANGAY TANYAG
Taguig City
1603

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 12pm - 6pm

Telephone

+639357025703

Website

Alerts

Be the first to know and let us send you an email when RIGOR Architects posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RIGOR Architects:

Share