03/26/2026
A lot goes into cabinet installations before the finishes ever go in.
On this project we're working through some existing conditions in the home, including nearly a 1/2" dip in the floor and a 1" variation in ceiling height across the space. These are the types of details that aren't always visible at first glance, but they have a significant impact on how the final kitchen comes together.
At this stage, our focus is on getting everything properly aligned, leveled, and set. Taking the time to address these inconsistencies now ensures they won't be as visible when all the finish details come together.