08/29/2026
This was a fun one. Vista Culvert Removal for City of Port Orford. We removed a failing 5' culvert in a stream that is the towns water supply. We relocated 2200 yards of material to a nearby stockpile site, then rehabbed the area and applied erosion control measures. Onto the next before the rains hit