We LOVE all the new modern updates we achieved with this home!!! π‘
-Removed old carpet and laminate flooring.
-Installed additional 1/4 subfloor to raise new flooring to meet baseboard paint lines.
-Installed new LVP flooring throughout main level approx 1500 sq ft including new stair treads and risers.
-Installed wainscoting in 1/2 bath.
-Installed new toilet, vanity, mirror and vanity light.
-Hung wallpaper in 1/2 bath.
-Blended new tile with existing tile on the landing at the bottom of the stairs.
-Removed old banister and handrail and had new ones installed.
-Removed countertops, sink, cabinets, tiled pedestal for washer and dryer& ironing board cabinet in laundry room.
-Lowered dryer vent, washer supply box and electric.
-installed new upper and lower cabinets.
-Installed new farmhouse apron front sink.
-Installed new under cabinet lighting.
-Installed 6 new can lights.
-Painted walls, ceiling, and trim.
-Sanded and re-stained threshold to garage to match new flooring.
(Bellbrook, Ohio)