Chairman Of The Board

Chairman Of The Board Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Chairman Of The Board, Colorado Springs, CO.

Big project over the summer, 12’x50’ timber frame addition we added onto this barndominium up in Castle Rock!
10/31/2025

Big project over the summer, 12’x50’ timber frame addition we added onto this barndominium up in Castle Rock!

Been pecking away at this house in phases throughout the summer, finally got a done stamp on it today. Replaced the ori...
10/31/2025

Been pecking away at this house in phases throughout the summer, finally got a done stamp on it today. Replaced the original 1970s aluminum casement windows with new vinyl assemblies. All new trim work with proper top flashing that wasn’t installed previously. Followed by a complete exterior repaint (mustard delete) and gutter replacement. Onto the next!

Nice to get this one wrapped up, took a window and made this basement into a walkout. Had to temp wall, and add a double...
03/08/2025

Nice to get this one wrapped up, took a window and made this basement into a walkout. Had to temp wall, and add a double LVL header after opening up the wall, and finding a decent load where we were wanting to put in a French door. Teamed up with Preferred Concrete to add buttress walls to reinforce the foundation before cutting out the opening, and finished off with a 14x14 concrete pad with curbs on both sides to keep the dirt from washing onto the concrete pad.

Had a fun few work days in the boonies getting this barndominium trimmed out with my brother!
01/25/2025

Had a fun few work days in the boonies getting this barndominium trimmed out with my brother!

Quick pressure wash and restaining on this fencing, 1600 sq. ft. Pressure washed and stained in 2 days!
12/18/2024

Quick pressure wash and restaining on this fencing, 1600 sq. ft. Pressure washed and stained in 2 days!

Before and after on this 70s deck that needed a rebuild from rotted structural framing, as well as not being up to code....
12/18/2024

Before and after on this 70s deck that needed a rebuild from rotted structural framing, as well as not being up to code. Framed deck on 1’ centers, added load bearing posts, and cut new stair stringers. Stained all framing to match trim paint on house & fencing. Installed Trex composite decking with hidden fasteners, and topped it off with fortress powder coated posts and railings. Should be good for the next 50 years. 👍🏼

This was a fun/challenging transformation on this stairwell. Homeowners were getting hardwood floors refinished and were...
10/02/2024

This was a fun/challenging transformation on this stairwell. Homeowners were getting hardwood floors refinished and were wanting a new look for the railing. decided on solid oak balusters and handrail with no fasteners showing for a seamless finish. Went with wrought iron spindles to finish it off. 🔨

Before and after of a 16’ welded arched gate installed this morning! connected existing power ram and putting in new but...
09/21/2024

Before and after of a 16’ welded arched gate installed this morning! connected existing power ram and putting in new button posts for easy entry.

Big project that Above the line excavation and I teamed up on, sewer line tie in to outbuilding, and 3 RV dump sites alo...
09/21/2024

Big project that Above the line excavation and I teamed up on, sewer line tie in to outbuilding, and 3 RV dump sites along a 340 ft line to connect to existing septic system. Also ran 500 ft of 1” PEX waterline to supply 4 new hydrants throughout the property. Also added electric to make 3 full hookup RV sites for visitors.

07/20/2024

Finally got this deck wrapped up. 1600 total feet of deck space to enjoy the views of this property up by the Air Force Academy. Thanks Above the line excavation for helping with digging/pouring piers and grade work.

Busy few days getting this 12,000 Sq. Ft. Commercial building fixed up before new tenants move in. Lots of plumbing upgr...
05/27/2024

Busy few days getting this 12,000 Sq. Ft. Commercial building fixed up before new tenants move in. Lots of plumbing upgrades, patching, texturing and painting walls but we got it done before the deadline 💪🏼 thanks Jake for lending a hand with the paint prep!

Address

Colorado Springs, CO

Telephone

+17198003355

Website

Alerts

Be the first to know and let us send you an email when Chairman Of The Board posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share