02/28/2026
This is the bathroom before the renovation began.
The project started from this space.
The first step was demolition, removing the old materials and preparing the area for the new finish.
After demolition, the next step was applying silicone around the corners and base of the shower system.
This process helps seal the areas and prevent water leaks or future infiltration problems.
After sealing, installation of the 24 by 48 marble-look porcelain tile began, creating a more modern appearance.
Tile was installed on the walls and shower floor area, with careful attention to alignment for a clean finish.
The plumbing system was installed and checked during the renovation process.
Final finishing work was completed, including painting and final adjustments.
The bathroom looks beautiful, functional, and more modern.
If you want to transform your bathroom, feel free to contact us for more information.
This is the bathroom before the renovation began.
The project started from this space.
The first step was demolition, removing the old materials and preparing the area for the new finish.
After demolition, the next step was applying silicone around the corners and base of the shower system.
This process helps seal the areas and prevent water leaks or future infiltration problems.
After sealing, installation of the 24 by 48 marble-look porcelain tile began, creating a more modern appearance.
Tile was installed on the walls and shower floor area, with careful attention to alignment for a clean finish.
The plumbing system was installed and checked during the renovation process.
Final finishing work was completed, including painting and final adjustments.
The bathroom looks beautiful, functional, and more modern.
If you want to transform your bathroom, feel free to contact us for more information.