12/23/2025
Good Afternoon
First off huge round of đđ for our clients they were everything and then some - they came to us after completing bathroom remodel and powder room remodel downstairs asking if we could do both bathrooms upstairs at same time. They offered to move out of the house in order for this to be done before Christmas âŚâŚ.little behold that is exactly what we did.
We demoed both bathrooms and the work began see below:
Kids Bathroom (Hallway and smaller one): altered plumbing to convert from double sink vanity to single sink vanity + coverted bathtub to complete stand in shower with now new detachable secondary shower head. Electrically we rewired two recessed lights above for two sconces above vanity and keep one recessed lights centered above sink. Installed new exhaust bathroom fan (there was never one to begin with). We had to reinforce old framing of shower ceiling since we removed suffit in preparation for new sheetrock. Installed new sheetrock outside of shower area where needed. Installed new plywood on old subfloor + wonderboard + self leveling (we needed 10 bags for both bathrooms). Installed schluter water proof shower system in preparation for tiling. TILING: shower walls are 2x10 âShapes Ivoryâ with TEC power âstandard whiteâ grout. At bottom of walls and continued as baseboard around entire bathroom was 2x8 Botanica Sage with Mapei âCavern Mossâ Ultracolor grout. Shower floor/ Main floor are R&D Ming/Thassos with Mapei âMoonbeamâ grout. Then we covered everything up for the walls to be painted with Bath & Spa Aura âNightmistâ on walls , white on ceiling and semi-gloss white on door and trim. Installed new Medallion Cabinetry 62â âEucalyptusâ single sink vanity with Kohler fixtures everywhere in bathroom with andy star mirror and millenium sconces, lastly Dreamline sliding shower glass enclosure.
Master Bathroom: Prepared plumbing for new free-standing bathtub and faucet + shower to be added secondary detachable shower head. Electrically prepared for new millenium chandelier above bathtub + new recessed lights everywhere else + new switches and gfci outlets. Once that was all done we had to take care of the floors + new plywood to strengthen subfloor (where needed). New wonderboard and self-leveling. Shower was fully prepared with new schluter water proof shower system and this time we added 2 separate niches. Once that was all taken cared of it was on to the tiling. TILING: shower walls were Calcatta gold wave + shower floors were 2â round Allstone Calcatta Gold Dots + main floor was mixture of 12âx12â Marmo Calcatta & Marmo Verde.
All stones in both bathrooms were cut from remaining slab at our supplier to all match as perfect as possible.
Lastly prepared wall & ceiling for painting Bath & Spa Aura âwhiteâ for ceiling â Seapearlâ for walls & semi-gloss white for trims and main door.
Install all Kohler fixtures + andy mirror + 67â Medallion Cabinetry âFrench Roastâ double-sink vanity đŽâđ¨
Lastly as part of work done by some plumber prior to us coming in we had to fix up and repaint entire ceiling downstairs in kids playroom. And next year we will be called back in for opportunity at their kitchen remodel project , stay tuned for 2026!
For your free estimate on your next kitchen or bathroom remodeling project just dm us or call at 973-252-9051 today
NJHIC
# homeimprovement