23/07/2026
Replaced all garge door trim, weather stripping, and the walk in door. Painted the shutters and wood window frame. Installed seamless gutters with down spouts and gutter guards. Cleaned and washed moss a dirt from the shingles on the garage and clear sealed. Removed the shingle roof on the house and installed new shingle roofing.