03/18/2026
I cannot thank my friends Sarah and David enough for keeping me busy during this long and brutally cold winter. Stayed busy doing a bare bones renovation of the lower level of their split level home that was damaged from a water line burst. Partial ceiling replacement with matching texture to existing, crown and base molding all around, steel beam wrapped in premium pine, nice quality vinyl flooring with underlayment, all new light fixtures, new vanity, mirror and toilet. Fluted columns at the base of the steps wrapped with crown molding ties in nicely to the upstairs finish carpentry.