01/31/2026
It's been a little bit since I've posted, but here's what we are working on now!
(Bardo project) We got electric pulled and going inside the garage and installed all of the metal on the walls and ceiling, wrapped all the doors and windows in white coil. 5urned it great!
Now as far as the house we are about 50% done with the 1st floor framing and we should have that, and 2nd floor finished by the end of next week to start wire rough in! Then onto plumbing rough in, HVAC and insulation!
As drywall is going on the living side we will be working on the 40x60 gymnasium side installing metal to match the garage!