01/28/2026
Post 6: Addition renovation. This portion included renovations to a studio in which the client wanted to remove the garage, kitchen, and bedroom walls to make one open floor plan. Due to the type of construction (king jack/center post and truss framing) the interior walls were easily removed. The garage floor was raised level with interior floors, and the garage door opening was framed in with a door installed. The linoleum flooring and carpet were removed in preparation for new flooring. Kitchen cabinets were removed, plumbing was capped in basement. Lighting circuits were rearranged, and added 3 way circuit for new pocket lights in main room. Drywall patching, install and addition of a closet were also done prior to client priming and painting.