SFS & KEPC would like to thank summit_academy_ for once again trusting us with their flooring project. This space will now become a Vocational Education Center. Also utilized by their Summer Camp.
We tore out old VCT & glued down carpet. We used an industrial vacuum & concrete grinder to flatten the uneven concrete. We used a moisture v***r barrier before all flooring went down. We then installed new LVT in the lab room & restroom. We installed a light brown, commercial Walk Off Tile for the back entrance . We used those same tiles for the upstairs landing & hallway. The stairs will be completed after painting. We installed a Color Pop carpet tile pattern in the classrooms. We hung new 6” black cove base throughout.