MRM Project Management

MRM Project Management MRM Project Management specializes in transforming basements, bathrooms, and kitchens into beautiful, functional living spaces.

From design to final walkthrough, we handle every step with expert management, quality craftsmanship, and clear communication.

Prairie Village full remodel making strong progress. Drywall is complete and we’re now moving into trim and tile. Next w...
03/11/2026

Prairie Village full remodel making strong progress. Drywall is complete and we’re now moving into trim and tile. Next will be paint, flooring, and cabinet finishes as we bring this project into the final stages. Looking forward to seeing the full transformation come together.

Interior trim has been completed and painting is now underway. Basement finishing has officially begun. Exterior work is...
02/23/2026

Interior trim has been completed and painting is now underway. Basement finishing has officially begun. Exterior work is moving along as well, the concrete driveway and rear pathway are complete, brick detailing at the front entry is finished, and the front door has been installed.

Vaulted ceilings are complete, new windows and door are in!  The new master bath and hall bath are fully framed, and we’...
02/12/2026

Vaulted ceilings are complete, new windows and door are in! The new master bath and hall bath are fully framed, and we’re deep into plumbing, electrical, and HVAC rough ins. Hardwood floors are going in now, and once that’s wrapped up, we move into Sheetrock. It’s all starting to come together.

Demo is complete at the Prairie Village remodel. The project is moving into core construction, framing, plumbing, electr...
01/23/2026

Demo is complete at the Prairie Village remodel. The project is moving into core construction, framing, plumbing, electrical, and HVAC. This phase handles structural changes and system upgrades that define the home’s layout, flow, and performance. Check out these before and after photos of the demo! Progress updates coming soon.

Stucco installation is complete and we’re now in the curing phase for the next 3 weeks before moving into the next steps...
01/08/2026

Stucco installation is complete and we’re now in the curing phase for the next 3 weeks before moving into the next steps. Inside, hardwood floors are finished, and we’re currently working on trim and doors. Tile and brick has been delivered and will be going in soon. Big progress all around!

Just finished this beautiful full bathroom remodel inspired by coastal tones and beach vibes, calm colors, a space that ...
12/18/2025

Just finished this beautiful full bathroom remodel inspired by coastal tones and beach vibes, calm colors, a space that feels light, relaxing.

This week at the Brookside new build we just finished up hanging the sheetrock and concrete board. Now we will tape, mud...
12/03/2025

This week at the Brookside new build we just finished up hanging the sheetrock and concrete board. Now we will tape, mud and sand. Following that is trim, install tile and work on pouring the new driveway and back patio!

Fairway garage addition has trim being completed this week, coming up Paint, epoxy garage floor and finishing touches. C...
11/21/2025

Fairway garage addition has trim being completed this week, coming up Paint, epoxy garage floor and finishing touches. Check out the outdoor kitchen, starting to really come together!

This week at the Brookside new build insulation is going in. Take a look at these videos to see a little bit of the proc...
11/14/2025

This week at the Brookside new build insulation is going in. Take a look at these videos to see a little bit of the process! Next up will be Sheetrock😃

Brookside new build wrapped up plumbing, HVAC, and electrical this week. Next steps are insulation, inspection, then She...
11/07/2025

Brookside new build wrapped up plumbing, HVAC, and electrical this week. Next steps are insulation, inspection, then Sheetrock begins!

Transformation complete in Merriam, KS! Added a garage extension, 2 new rooms, a full bath & laundry, a spacious screene...
10/31/2025

Transformation complete in Merriam, KS! Added a garage extension, 2 new rooms, a full bath & laundry, a spacious screened porch, and a brand new kitchen. Turning visions into reality, one project at a time.

Address

Mission Hills, KS
66208

Opening Hours

Monday 7:30am - 5pm
Tuesday 7:30am - 5pm
Wednesday 7:30am - 5pm
Thursday 7:30am - 5pm
Friday 7:30am - 5pm

Alerts

Be the first to know and let us send you an email when MRM Project Management posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MRM Project Management:

Share