02/25/2026
Historically, the transition between bridge deck segments and approach slabs has compromised ride quality. Diamond grinding solves this, but specifications usually require longitudinal grinding over the entire bridge length and width. To execute this successfully and avoid costly penalties, contractors should follow some simple steps including protecting the expansion joints, ensuring tight controls and adding additional concrete thickness during paving, to name a few.
Proper preparation prevents damage to critical bridge components and ensures the final surface meets specifications. See all the recommended steps here: https://ow.ly/LrwG50Y8t8t