02/25/2021
I posted something similar to this a couple weeks ago... Got the demo done rather quickly and than... SILLY ME! Thought I could beat the snow, make a concrete form and get the precast stairs in. However due to weather not being on outside, the concrete form and stairs have been put on hold, however this is a 2 story, 2 family building that is being completely gutted and renovated. So with the poor weather it gave me some time to get inside, help the owner get the demo done, and start laying down new subfloor. Within the next couple weeks we will be putting new subfloor down, some new tile flooring, as well as restoring some old hardwood floors! We will also be putting drywall up throughout the entire building, new stairwell to the basement, some new support beams in the basement (Lally columns) we will be building the entire kitchen cabinets from scratch, new windows, new floors, ceilings, and hopefully in the spring time, a new driveway and yard make over!! Stay tuned the next couple weeks for photos of the inside. Right now everything is basically gutted down to the studs and floor joists with the exception of the subfloor that I have started. This building is located in a beautiful neighborhood in Worcester and will be for rent and ready for move in by April 1st 2021.