Complete 2nd level remodel
-full gut down to the studs
-removed old k**b and tube electrical
-installed all new drywall
-installed all new interior & glass doors
-installed all new door,window,base trim
-installed all new floor coverings
-installed custom designed closet organizers
-new paint throughout
-new handrail
-installed LVP on stairway
-Installed new LVP on first level living room
The end result to a very detailed project. Working in older homes comes with challenges,but the experience and attention to the craft by my team makes any home look modern.