04/25/2026
🚧 Bathroom Remodel Progress Update – Coming Together Strong 🚧
We’re in the final stretch on this custom bathroom transformation and it’s really starting to come to life.
✔️ Full tile layout installed – clean lines, tight joints, and a sharp mix of large format and subway
✔️ Custom knee wall built and capped – ready for glass install
✔️ Shower area fully formed with detailed corner work and layout dialed in
✔️ Floor tile set and locked in
Right now we’re moving into the finish phase:
🔹 Grouting + silicone
🔹 Final drywall + paint
🔹 Fixture installs (vanity, toilet, trim)
🔹 Glass install to wrap it all up
This is where the details matter—and that’s what separates a good job from a great one.
Stay tuned for the final reveal 👀
📞 Free estimates
“Making Your Home Yours” – Johnny Gee’s Contracting