04/10/2026
We got all the forms stripped, below grade foundation waterproofed, a ton of gravel around the house and inside too prep for concrete slabs and the back porch slab formed and footers for the porch roof dug. Next 2 week hopefully brings in ground plumbing, another round of inspections and prepping and pouring concrete slabs. We are moving right along!