MZK A+D Licensed San Francisco LBE leveraging BIM & Building Code expertise on a range of design & permitting

Now that numero dos has opened, we have to share a little behind the scenes of one of my favorite San Franciscans ever
03/11/2026

Now that numero dos has opened, we have to share a little behind the scenes of one of my favorite San Franciscans ever

Bringing high-end dental design to the heart of Daly City! šŸ“āœØMZK Architecture + Design (MZKAD) is officially in the Enti...
02/27/2026

Bringing high-end dental design to the heart of Daly City! šŸ“āœØ

MZK Architecture + Design (MZKAD) is officially in the Entitlements phase for our latest project: a luxury dental studio located in a premier Daly City shopping mall.

Building in a major retail hub requires a specialized approach. We are currently navigating the complex entitlements process—which we expect to wrap up in the next 3–4 weeks—ensuring every technical medical requirement aligns perfectly with high-end aesthetic standards.

The Project Roadmap:
1ļøāƒ£ Entitlements (In Progress - 3-4 Weeks)
2ļøāƒ£ Permitting
3ļøāƒ£ Construction

At MZKAD, we don’t just design spaces; we manage the complex hurdles that make luxury medical TIs possible. From Daly City to the rest of the Bay Area, we’re setting a new standard for patient-centric design.

Visit us at www.mzkad.com to see how we’re transforming the dental experience.

Excited to be partnering with a developer on another hillside residence in Montclair Hills, Oakland.Designing in steep t...
02/20/2026

Excited to be partnering with a developer on another hillside residence in Montclair Hills, Oakland.

Designing in steep terrain requires more than aesthetics. It demands early coordination, strategic entitlement planning, and a deep understanding of grading, structural systems, and neighborhood context. With experience across eight hillside lots and seven additional entitled parcels, we approach these projects with clarity and discipline.

Each hillside site presents constraints. The opportunity lies in turning those constraints into architecture that feels intentional, grounded, and market ready.

Looking forward to bringing this one to life.

Installing a custom residential lift for a private client and longtime friend in Palo Alto. Designed to integrate seamle...
02/20/2026

Installing a custom residential lift for a private client and longtime friend in Palo Alto. Designed to integrate seamlessly into the architecture, this addition prioritizes accessibility, mobility, and long term livability without compromising refined aesthetics.

Aging in place is not an afterthought. It is a design decision. By incorporating vertical access early in the planning process, we are creating a home that supports independence, safety, and comfort for years to come. Quiet performance, clean detailing, and material continuity ensure the lift feels fully embedded within the residence rather than appended to it.

Thoughtful design serves both present living and future needs.

Awarded.Our federally funded roof remodel project is officially moving forward, and we could not be more proud of the te...
02/17/2026

Awarded.

Our federally funded roof remodel project is officially moving forward, and we could not be more proud of the team effort behind it. Public-sector projects demand more than construction expertise. They require coordination, compliance, documentation discipline, and a contract structure that protects all stakeholders.

01/16/2026

Pathway to the throne room on one of our past projects. Proof that even the walk to the bathroom deserves a moment.



San Francisco, we are building something special.Here is a little look behind the curtain at our second Turtle Tower loc...
01/06/2026

San Francisco, we are building something special.

Here is a little look behind the curtain at our second Turtle Tower location. This is how the space comes together, tools out, tarps up, and the dining room taking shape day by day. We are putting the same care into this space as any other.

Dine-in is opening soon, and the TT team cannot wait to welcome you in.

Until then, Turtle Tower is open now for takeout and delivery, so you can keep the pho flowing while we finish the final touches.

Thank you for your patience, your support, and for carrying this local legacy with us. See you very soon.

We are issuing a Request for Proposals (RFP) for roof repair work on two buildings located in East Palo Alto. This is a ...
12/23/2025

We are issuing a Request for Proposals (RFP) for roof repair work on two buildings located in East Palo Alto. This is a Davis-Bacon prevailing wage project, and we are seeking qualified Bay Area–based contractors.

If you are interested or have questions about the scope or submission process, please feel free to reach out.

We’re officially underway with this commercial TI project in the Excelsior District!With a great owner and an aggressive...
11/20/2025

We’re officially underway with this commercial TI project in the Excelsior District!
With a great owner and an aggressive timeline, our team is moving fast to transform this space. Demolition is done, and the new framing is already going up.
Stay tuned for updates! We can’t wait to reveal what’s coming to the neighborhood!

This pre-design rendering for our non profit client is more than a concept—it’s a reminder that neighborhood transformat...
08/28/2025

This pre-design rendering for our non profit client is more than a concept—it’s a reminder that neighborhood transformation starts with steps that are within reach. Think: planter boxes, public art, sidewalk seating, or community gardens. ✨

But even the smallest improvements often move through a maze of planning entitlements, community input, and design review. That’s why we’re committed to not just the vision—but the process. Because behind every beautiful corner is the subjective need to cover design thoughtfully, intentionally, and inclusively.

Whether it’s one mural or five native trees, every detail adds up to a more walkable, connected, and beautiful Bay Area. Let’s bring pride and place-making back to the block—together. šŸ’ŖšŸ½šŸ™ļø

| |

Final inspection passed!We’re excited to share that Moku Yakitori has officially passed final inspection with San Franci...
07/26/2025

Final inspection passed!

We’re excited to share that Moku Yakitori has officially passed final inspection with San Francisco Building and Health for their brand-new sake bar, located right next door to their yakitori spot.

We had the pleasure of helping Moku navigate the design , entitlement and construction process, and it’s always rewarding to see passionate local owners expand and bring even more authentic Japanese flavors to the neighborhood.

If you’re nearby in the Richmond neighborhood, stop in for expertly grilled skewers paired with sake, the perfect match.

Congrats to the Moku team!

Address

150 SUTTER Street
San Francisco, CA
94104

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm

Alerts

Be the first to know and let us send you an email when MZK A+D posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share