03/30/2019
I participated in the LOVE SLO Day again this year. This time I heard that the pathways at the SLO Botanical Garden were in poor shape. It had been many years since material was replenished and the ( awesome!) rains had eroded many areas and washed mud into the pathways.
I worked with the directors of the garden and arranged for 24 tons of pathway material ( DG) to be delivered.
My crew and I moved the material as close to the pathways as possible on Friday.
On the Saturday, there were more people than I had planned. Trails were raked, compacted, re-raked.
My camera was damaged the week after the event so I don't have any pictures of my own, but there were Slo High School students, Mission Prep Students, Elementary Students, a Boy Scout, retired people,at least one doctor, and families.
Exhausting work but feels great to do something like this!