12/13/2024
I've been working on this little project for the past two weeks. First time putting in this type of flooring, with new methods. Had to repair a soft spot by the back door. I installed the cabinets and counter top, sink and plumbing in November. I've been doing toilet installs, sewer line repairs, and gas inspections/ repairs/ new installs in-between times. Just got done with the drain line on a new home build. Waiting on framing to continue, so about a month or less. Going back to flooring tomorrow, grout work next.... I will be posting updated pictures later.