𝗕𝗘𝗙𝗢𝗥𝗘 & 𝗔𝗙𝗧𝗘𝗥: 𝗬𝗠𝗖𝗔 𝗕𝗢𝗜𝗟𝗘𝗥 𝗥𝗘𝗣𝗟𝗔𝗖𝗘𝗠𝗘𝗡𝗧
A major upgrade for a facility that serves our local community!
The existing 800,000 BTU gas boiler had developed a crack and was oversized for the existing heat exchanger. We replaced it with a properly sized 400,000 BTU fire tube boiler, designed to better match the system’s needs and improve operation.
𝗧𝗵𝗲 𝘂𝗽𝗴𝗿𝗮𝗱𝗲 𝗶𝗻𝗰𝗹𝘂𝗱𝗲𝗱:
✔️ New 400,000 BTU Lochinvar FTXL fire tube boiler
✔️ Multi-speed pump to help eliminate over-cycling and over-firing
✔️ New expansion tank
✔️ New air separator
✔️ New strainers
This YMCA pool provides an important resource for surrounding schools’ swim teams and YMCA activities. Keeping facilities like this operating reliably matters to the entire community.
Another project completed with the right equipment, proper sizing, and attention to the details that make a difference!