JG Construction Do not respond to messages on weekends.

The kitchen ceilings and Joyce are torn out, ready to be raised approximately one foot.
04/14/2026

The kitchen ceilings and Joyce are torn out, ready to be raised approximately one foot.

Crawlspace excavation is complete for bathroom and drain installation, plumbing for water lines is still in progress alo...
04/12/2026

Crawlspace excavation is complete for bathroom and drain installation, plumbing for water lines is still in progress along with ceiling demolition for drywall installation.

I have completed acquiring the necessary framing materials. I can now proceed with the plumbing installation, and pictur...
04/01/2026

I have completed acquiring the necessary framing materials. I can now proceed with the plumbing installation, and pictures will follow.

bathroom reconstruction, specifically repairing minor framing issues and floor joists. right now.
03/29/2026

bathroom reconstruction, specifically repairing minor framing issues and floor joists. right now.

The bathroom have been completely demolished and removed. The next project phase will involve removing the outdated plum...
03/26/2026

The bathroom have been completely demolished and removed. The next project phase will involve removing the outdated plumbing and installing new

We simply need to remove the existing floor and a single small wall, after which we can commence reconstructing the bath...
03/22/2026

We simply need to remove the existing floor and a single small wall, after which we can commence reconstructing the bathroom.

A small-scale bathroom renovation project is currently underway, with demolition work being conducted today. Additional ...
03/21/2026

A small-scale bathroom renovation project is currently underway, with demolition work being conducted today. Additional pictures will follow.

The ceiling is complete; it requires only a light sanding upon drying.
03/18/2026

The ceiling is complete; it requires only a light sanding upon drying.

The ceiling patch has been taped; now it requires a couple of skims.
03/15/2026

The ceiling patch has been taped; now it requires a couple of skims.

Designed and built a custom table for a client.
03/08/2026

Designed and built a custom table for a client.

Refinishing another floor
02/01/2026

Refinishing another floor

Address

Locational
Wilmington, OH
43113

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

(937) 900-8514

Website

Alerts

Be the first to know and let us send you an email when JG Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share