09/04/2026
Ok friends, I’m going to be brutally honest with you here.
1. I don’t know how we got to Sept. I thought yesterday was July. 🙃
2. I promised you all the final reveal of the gorgeous kitchen…. And I haven’t shared that yet.
But here’s the truth-bomb. It’s actually not 100% complete yet.
Not because of scheduling, or ordering. Not because of the contractor, the designer, or the homeowner. Not because of the supplier.
But because there is a clip for the refrigerator that had to be remade, redesigned, or put into production. And that one small piece has taken longer than anyone imagined in would take. I don’t know the specifics. But we’re waiting…. Patiently.
The refrigerator showing in this space is a loaner, that Martin Appliance has graciously provided for the homeowners to use in the interim. This allows them to use the space while waiting for their beautiful new panel-ready refrigerator to arrive.
I’m here to tell you that nothing ever goes 100% as planned with construction projects, but we do everything we can to make unforeseen circumstances as minimally challenging as possible.
So give it some time…. There WILL be final reveal pics coming. Eventually. Until then…. Enjoy this before and “almost” after. 😁