Garage is built! This 3 car garage doubles the length of the house and helps break up the boxy look.Before setting truss...
05/05/2026

Garage is built! This 3 car garage doubles the length of the house and helps break up the boxy look.

Before setting trusses, we hung drywall to save time later. This will serve as the firewall between the house and the garage.

Had to fight through some strong wind, but we got the trusses set and roof sheathed!Next up is a foil underlayment to he...
04/10/2026

Had to fight through some strong wind, but we got the trusses set and roof sheathed!

Next up is a foil underlayment to help reduce attic temperatures and add another layer of protection against water.

2nd floor exterior walls and the 2-story entryway walls are up and sheathed.Now onto the roof to get it dried in as soon...
04/08/2026

2nd floor exterior walls and the 2-story entryway walls are up and sheathed.

Now onto the roof to get it dried in as soon as possible, then we’ll go back and finish up the remaining framing.

Security Tower is up and running.24/7 recording, auto-tracking, live alerts, and remote monitoring so we can keep an eye...
04/07/2026

Security Tower is up and running.
24/7 recording, auto-tracking, live alerts, and remote monitoring so we can keep an eye on things when we’re not on site.

The first floor and walls are framed. Now onto the second floor.We’ve been working around rain and mud, but the house is...
03/16/2026

The first floor and walls are framed. Now onto the second floor.

We’ve been working around rain and mud, but the house is starting to take shape now!

The floor beam is set, lumber has been delivered, and the first-floor framing is complete.If the spring rain doesn't get...
03/09/2026

The floor beam is set, lumber has been delivered, and the first-floor framing is complete.

If the spring rain doesn't get in our way too much, progress should be pretty quick from here!

Concrete flatwork is done!Lumber will be delivered soon, then it's onto framing
03/04/2026

Concrete flatwork is done!
Lumber will be delivered soon, then it's onto framing

While installing the foundation perimeter drain, we took the opportunity to install gutter drains as well.  When the lot...
03/02/2026

While installing the foundation perimeter drain, we took the opportunity to install gutter drains as well. When the lot allows them, gutter drains are a nice addition that will definitely be appreciated in the future.

Foundation walls are poured!It was a little chilly out❄️ but the concrete is in and curing
02/27/2026

Foundation walls are poured!

It was a little chilly out❄️ but the concrete is in and curing

The basement is excavated and footings are being poured!
02/19/2026

The basement is excavated and footings are being poured!

The front half of the property and build site have been cleared and are ready for the next phase.The entrance that was i...
02/13/2026

The front half of the property and build site have been cleared and are ready for the next phase.

The entrance that was improperly installed by the land developer has been removed, and a properly built driveway base has been installed, continuing all the way up to the build site and around the circle drive.

One step closer to getting the house underway.