22/12/2022
Big job bathroom renovation job went backwards as shower pipe had small leak for about 2yrs so had to demo half the wall replace some hardwood floor and rebuild π¬
Here is some progress pics from day I started to present am starting to see the light at the end of the tunnel.
Walls to be painted over Christmas xx