MDR Constructions

MDR Constructions All types of building by a registered builder. All types of building including:

- Home maintenance & renovations
- Extensions
- Decks & pergolas

Stumps, sub floor and walls this week
28/03/2025

Stumps, sub floor and walls this week

85inch Flat screen and electric heater recessed into a new LuxPanel wall. Looks amazing
24/03/2025

85inch Flat screen and electric heater recessed into a new LuxPanel wall. Looks amazing

Montrose Ext. LTJ Tiling & Fine Edge Glass with the final touches.
26/10/2024

Montrose Ext. LTJ Tiling & Fine Edge Glass with the final touches.

Montrose Ext. Living room with huge 90 inch Flat screen. Blackbutt tongue & groove flooring looks incredible. Great sand...
25/10/2024

Montrose Ext. Living room with huge 90 inch Flat screen. Blackbutt tongue & groove flooring looks incredible. Great sand & polish by Danny from Cardinia Floors.

Montrose Ext. Laundry & Store room.
24/10/2024

Montrose Ext. Laundry & Store room.

Montrose Ext. Looking towards the barn door that separates existing to new. New hallway created to the extension with a ...
23/10/2024

Montrose Ext. Looking towards the barn door that separates existing to new. New hallway created to the extension with a Velux skylight for natural light. Blackbutt tongue and groove flooring, sanded and polished by Cardinia Floors.

Bedroom 4&5 in the Montrose extension
23/10/2024

Bedroom 4&5 in the Montrose extension

Waterproofing done, ready for floor to ceiling tiles at Montrose.
05/09/2024

Waterproofing done, ready for floor to ceiling tiles at Montrose.

It was flooring week at Montrose this week. Solid 85x19 Blackbutt hardwood tongue and groove floorboards. Fixed down by ...
25/08/2024

It was flooring week at Montrose this week. Solid 85x19 Blackbutt hardwood tongue and groove floorboards. Fixed down by troweling on Bostik Ultraset glue and using 45mm secret nails. Sam Hewson from .co.construction a regular on all projects.

Brickwork ready for rendering and verandah ready for painting at Montrose extension. Another great job by Amberley Brick...
25/08/2024

Brickwork ready for rendering and verandah ready for painting at Montrose extension. Another great job by Amberley Bricklaying.

Roofing completed in Montrose
25/08/2024

Roofing completed in Montrose

An unused alfresco, enclosed to become an impressive workspace in Berwick
05/08/2018

An unused alfresco, enclosed to become an impressive workspace in Berwick

Address

Beaconsfield Upper, VIC
3808

Website

Alerts

Be the first to know and let us send you an email when MDR Constructions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MDR Constructions:

Share